We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Misclassifying a crack is the single most common mistake in this trade — treating a structural crack with the wrong material, or injecting a crack that actually needed a broader drainage fix behind it. We classify before we inject, every time.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Somerville, AL job.
An actively leaking crack rarely waits for a convenient afternoon — we prioritize dispatch for Somerville, AL cracks that are currently letting water in.
A single crack repair is one of the most predictably priced jobs we do — no surprise scope creep.
We carry both structural epoxy and flexible polyurethane so the crew can match material to the crack on the same visit.

Every Somerville, AL Foundation Crack Repair job starts with an inspection, not a generic package — here's what that typically includes.
Structural cracks that aren't actively leaking get epoxy injection, which bonds the concrete back together rather than just sealing the surface.
Polyurethane cures even in the presence of water, which makes it the right call for a crack that's actively letting water through.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
We document crack width and location with photos before and after injection so you have a record of the repair.
Fast turnaround matters during a real estate transaction, and we prioritize scheduling for time-sensitive pre-sale repairs.

Tell us the crack's location, whether it's actively leaking, and roughly how wide it is so we can bring the right materials.
A technician measures crack width, checks for wall bowing, and determines whether it's structural, cosmetic, or actively leaking.
You'll get a price based on crack length and material — epoxy or polyurethane — before any drilling starts.
Most single-crack injections are completed in a few hours, start to finish, in one visit.

"We were selling the house and the inspector flagged a foundation crack. They came out within two days, injected epoxy, and gave us documentation for the buyer's lender."
— Somerville Seller
"They explained why our crack was structural and not just cosmetic, which the previous contractor never bothered to check."
— Somerville Homeowner
"Had two cracks — one needed epoxy, one needed polyurethane. They matched material to each one instead of using the same thing on both."
— Somerville Customer
"Fast, clean work — no mess left behind after the injection ports were patched."
— Somerville Homeowner
Crack classification is separate from water contamination — we assess whether the crack is structural or cosmetic based on width, pattern, and any wall bowing.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
Epoxy is better for structural bonding on a non-leaking crack; polyurethane is better for a crack that's actively weeping since it cures even with water present.
Most single-crack injections are completed in a few hours during one visit.
If new movement occurs elsewhere in the wall, that's a separate issue we'd assess independently.
Yes — we provide before-and-after photos and a repair summary that Somerville, AL buyers, sellers, and lenders commonly request.
We handle foundation crack injection throughout Somerville and the surrounding Somerville, AL service area, including the zip codes listed below.



Zip codes we serve in Somerville, AL: 35670
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.